Crown Control Systems Limited

THE CHALLENGE

Crown Control Systems received an order from Comau Estil to carry out the electrical installation of the body shop assembly lines for the Jaguar X Type at Halewood Merseyside.

THE SOLUTION

All designs and materials were supplied by Comau, Crown were responsible for their own supervision and planning. Risk Assessments were carried out to identify potential safety hazards and appropriate remedial action taken to minimise the risks. All work was undertaken in accordance with Method Statements produced by Crown.

THE RESULT

Over the Summer of 2000, the following lines were installed:

  • Rear Floor
  • Front Floor
  • Front Structure
  • Front Apron
  • MIG Weld Training Cell
  • Hood
  • Framing
  • Cowl Top
  • LH ABC Pillar
  • RH ABC Pillar
  • High level Communication Network